Location in architecture: what to analyze before designing

2026.11.23 / Pedro J. Hernández

The location in architecture is the set of physical, urban, environmental and social conditions of the place where a building is planned. Analyzing it before designing allows us to know what can be built, how the building should relate to the plot and what decisions will reduce risks, costs and energy consumption.

A plot is not suitable only because of its dimensions or its views. The classification of the land, buildability, access, topography, terrain, water, sunlight, wind, infrastructure and the environment can completely transform the viability of a project.

What does location mean in architecture?

The location is not only the direction or position of the lot. Includes the relationship between the building and:

  • The current regulations and planning.
  • The geometry, orientation and slope of the plot.
  • The terrain and geotechnical conditions.
  • The climate and local microclimate.
  • The streets, accesses and service networks.
  • Vegetation, water and natural risks.
  • Nearby buildings, views, noise and privacy.
  • Mobility and services available.
  • The existing construction, if any.

The analysis must be carried out before fixing the shape of the building. A good plant placed in the wrong place can generate excessive earth movements, overheated facades, uncomfortable access or a distribution that is incompatible with the planning.

Types of architectural site

There is no single classification, but common situations can be distinguished:

Consolidated urban plot

It normally has nearby streets and services, but may be conditioned by alignments, party walls, buildable depth, patios, heights, heritage protection and relationships with neighboring buildings.

Border or expansion plot

It can offer greater formal freedom, although it is advisable to check whether development, accesses, connections and transfers are really executed and received.

Rural or dispersed plot

It requires special care to verify the urban situation, permitted uses, access, supply, sanitation, electricity, territorial conditions and landscape protection.

Plot with slope

The topography conditions access, earthworks, walls, drainage, foundations, views and adaptation of the home. A slope can be a project opportunity, but also significantly increase the cost.

Existing building

The location includes the construction that already occupies the plot. Structure, state of conservation, protection, possibility of expansion, accessibility and whether it is advisable to rehabilitate, transform or replace must be studied.

1. Urban feasibility

The first check is what the planning really allows. They should be reviewed, as appropriate:

  • Soil classification and grading.
  • Main use, compatible and prohibited.
  • Buildability and occupation.
  • Height, number of floors and setbacks.
  • Alignments, buildable backgrounds and patios.
  • Minimum plot and segregation conditions.
  • Heritage, environmental or landscape protections.
  • Easements of roads, coasts, channels, infrastructure or networks.
  • Situation of the urbanization and availability of services.

The viewers are an initial tool, but they do not replace consulting the planning, its modifications or the reports from the competent administration. In the Region of Murcia, the official portal SITMURCIA allows you to consult territorial information and available planning.

Before buying a plot, it is advisable to order a urban feasibility study that relates the regulations with the program and the specific geometry of the site.

2. Shape, dimensions and orientation of the plot

The registry or cadastral surface does not by itself describe the capacity of the lot. The front, the background, the angles, the narrowings, the position of the access and the orientation of each boundary matter.

Setbacks and occupation can leave a buildable area very different from the entire plot. An irregular geometry can make parking, turning vehicles, lighting rooms or relating to the garden difficult. That is why it is useful to draw from the beginning the real perimeter and the regulatory volume available.

3. Topography and earthworks

A reliable topographic survey allows you to know elevations, slopes, unevenness, walls, roads, trees and nearby elements. With this information it is decided how to support the building and how much land will need to be excavated, filled or contained.

Adapting to the slope can reduce clearing, earth transport and wall height. However, accessibility, vehicle entry, water evacuation, privacy and relationship between floors must also be resolved.

4. Land and geotechnical study

The superficial appearance does not allow us to know what foundation will be necessary. The land must be characterized through the geotechnical study appropriate to the building and location. Resistance, deformability, strata, fills, water table, expansiveness, aggressiveness and other conditions are analyzed.

These data affect foundations, excavation, containment, drainage and cost. The set of documents CTE Structural Safety includes the DB-SE-C Foundation and the framework for its verification.

5. Water, runoff and flooding

You have to study where rainwater enters, circulates and leaves. The plot can receive runoff from higher levels or concentrate it towards the building. Channels, boulevards, drainage, water table and evacuation capacity must also be reviewed.

The National Flood Zone Mapping System allows you to consult available official cartography. It is an initial reference that must be completed with planning, basin organizations, specific studies and applicable regulations.

6. Sunlight and shadows

The orientation conditions solar gains, natural light and protection possibilities. But it is not enough to know the north: the horizon, nearby buildings, vegetation, topography and shadows must be studied at different times and seasons.

A south façade can support different strategies than a west façade, exposed to the low afternoon sun. The analysis must be related to the use of each room and the solar path.

7. Wind and microclimate

Wind can promote ventilation and cooling, but also cause discomfort, noise, entry of dust or pressure on facades. Its behavior changes with streets, slopes, walls, patios and vegetation.

Temperature, humidity, shade, water, materials and soil generate local conditions different from those recorded by a weather station. The guide on microclimate in architecture explains how to incorporate these variables into the project.

8. Access and infrastructure

The actual connection to the street, supply, sanitation, electricity, telecommunications and, when applicable, gas must be checked. The visual proximity of a network does not guarantee that there is capacity or right to connect.

They should also be studied:

  • Width and slope of access.
  • Vehicle entrance and turning radius.
  • Machinery access during work.
  • Sanitation level and need for pumping.
  • Position of connections, manholes and easements.
  • Waste collection, emergencies and future maintenance.

9. Noise, views and privacy

Roads, commercial activity, leisure, schools or facilities can condition the orientation of bedrooms and outdoor spaces. A specific visit does not always reveal daily or seasonal behavior.

Favorable views must be balanced with sunshine, wind and privacy. Opening large openings into a landscape may require solar control, specific glass and interior organization that avoids exposure to neighboring plots.

10. Vegetation and landscape

Existing trees provide shade, identity and environmental value, but species, size, roots, condition, maintenance and regulatory protection must be studied. Its position may condition excavations, foundations and access.

New vegetation can improve the microclimate, filter views and accompany drainage, as long as it adapts to the availability of water, soil and climate. It should not be used to hide poor orientation or excess impermeable surface.

11. Rehabilitate, expand or demolish

When a construction exists, the decision should not be based only on its image. It is advisable to assess structure, distribution, envelope, facilities, protection, adaptation cost and amount of usable work.

Preserving part of the building can reduce waste and deadlines, but rehabilitation with deep incompatibilities can also be inefficient. The comparison must be made with defined alternatives, not with a general rule.

12. Mobility and nearby services

The location affects daily use beyond the consumption of the building itself. Distances to work, school, commerce, transport and public spaces determine time, mobility and dependence on the vehicle.

The IDAE guide on energy efficient urban planning relates urban form, climate, transportation, vegetation and infrastructure with the energy behavior of the built environment.

Examples of how the project changes

  • Urban plot between party walls: The priority may be to capture light through patios and control views and buildable depth.
  • West plot with views: It is advisable to balance the landscape with outdoor shade and distribution of spaces for evening use.
  • Sloped terrain: Staggering the home can reduce walls and improve the relationship with the outside.
  • Plot next to boulevard: The elevation, flood risk and drainage must be resolved before defining basements or accesses.
  • Existing home: structure and usable volume can guide a more efficient expansion than a total demolition.

What to check before buying a plot

  1. Simple note, Cadastre and physical correspondence of boundaries.
  2. Current planning and building parameters.
  3. Easements, affections and protections.
  4. Topography and access.
  5. Availability and level of services.
  6. Flood risks, terrain and foreseeable geotechnical conditions.
  7. Preliminary fit of the program, parking and outdoor spaces.
  8. Estimation of additional costs for urbanization, excavation or containment.

The useful answer is not just “can be built,” but what can actually be built on the plot and what conditions will affect the project and the budget.

Frequent errors

  • Buy based on surface area, price and views without checking planning.
  • Confusing cadastral information with urban planning authorization.
  • Design the home before surveying the topography and buildable volume.
  • Ignore slopes, walls and water drainage.
  • Assume that the connections are available because they pass nearby.
  • Orient all rooms towards the views without studying the sun.
  • Take a cartographic viewer as a definitive certification.
  • Do not compare rehabilitation, expansion and new construction with equivalent criteria.

Frequently asked questions

What is the location of a building?

It is the relationship between the project and the specific place: regulations, plot, terrain, climate, access, services, risks, landscape and built environment.

What is the first analysis of a plot?

Urban viability. Before developing a proposal, it is necessary to know uses, buildability, occupancy, heights, setbacks, conditions and situation of services.

Does Cadastre indicate what I can build?

No. Cadastre mainly describes physical reality and tax valuation. The building capacity derives from the planning and the applicable conditions.

Is the best orientation always south?

Not in isolation. Climate, shadows, views, shape of the plot, use of the rooms and possibilities of sun protection must be considered.

Turn analysis into a viable project

The location must transform conditions into project decisions, not be limited to a descriptive memory. If you are valuing a plot, I can make a urban feasibility study and then develop the single-family home project. To review a specific case, use the page contact.